Last updated on:
App Store Apps
>
Utilities
> Critical Path
Critical Path
1.2
Peter Tsang
3.50
2 reviews
$1.99
About Critical Path
Critical Path is an app developed
by Peter Tsang.
The app has been available since August 2018.
It's currently not in the top ranks.
It's rated 3.50 out of 5 stars, based on 2 ratings. The last update of the app was on June 25, 2023. Critical Path has a content rating "Everyone".
Critical Path has an download size of 9.08 MB and the latest version available is 1.2. Critical Path costs $1.99 to download.
It's currently not in the top ranks.
It's rated 3.50 out of 5 stars, based on 2 ratings. The last update of the app was on June 25, 2023. Critical Path has a content rating "Everyone".
Critical Path has an download size of 9.08 MB and the latest version available is 1.2. Critical Path costs $1.99 to download.
Description
More data about Critical Path
Price | $1.99 |
Rating | 3.50 based on 2 ratings |
Ranking | Not ranked |
Version | 1.2 |
App download size | 9.08 MB |
Suitable for | Everyone |
Alternatives for the Critical Path app
More from Peter Tsang
Changelog of Critical Path
No changelog data
Developer information for Peter Tsang
Peter Tsang
N/A
Share Critical Path
Comments on Critical Path for iOS
We don't have enough comments to show example comments. Please check back later.
App Store Rankings for Critical Path
This app is not ranked
Technologies used by Critical Path
Back to top